Conversation
Since every bc value is packed into a fresh Function on V (_pack_bc_value), `bc.g` is a snapshot of `g` taken at construction. The standard time-dependent pattern -- build the bc once, then `assign(new_value, g)` before every solve -- therefore silently solved with the construction-time value (typically zero), and the tape also kept depending on `g`'s construction-time block variable, so replay and gradients were wrong too. test_time_dependent_bc_replay did not catch it, since it only compares replay against an equally wrong forward run. DirichletBC now keeps its source expression and a compiled interpolation Expression, and exposes `_ad_refresh(annotate)`, which LinearProblem/ NonlinearProblem call on every bc before each solve: it re-packs the current source value into `bc.g`, and when annotating and the source's block variables changed since the last packing, records a fresh ExprInterpolationBlock + DirichletBCBlock so the solve depends on the bc value at that point of the tape. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Since every bc value is packed into a fresh Function on V (_pack_bc_value),
bc.gis a snapshot ofgtaken at construction. The standard time-dependent pattern (build the bc once, thenassign(new_value, g)before every solve) therefore silently solved with the construction-time value (typically zero), and the tape also kept depending ong's construction-time block variable, so replay and gradients were wrong too. test_time_dependent_bc_replay did not catch it, since it only compares replay against an equally wrong forward run.DirichletBC now keeps its source expression and a compiled interpolation Expression, and exposes
_ad_refresh(annotate), which LinearProblem/ NonlinearProblem call on every bc before each solve: it re-packs the current source value intobc.g, and when annotating and the source's block variables changed since the last packing, records a fresh ExprInterpolationBlock + DirichletBCBlock so the solve depends on the bc value at that point of the tape.